UNIJOINT CL SERIESStrip Seal Bridge Expansion Joint
Section steel expansion joint (strip seal)
UNIJOINT CL SERIES is a single-gap section steel expansion joint for bridges, viaducts and elevated roads: two steel edge beams anchored into the deck with a continuous neoprene W-seal locked into both beams.
- Technical data sheetReadPDF · 1.9 MB
- Drawings & CAD details (6)View & download
- Test report, MSDSOn request
About UNIJOINT CL SERIES
UNIJOINT CL SERIES is a single-gap section steel expansion joint for bridges, viaducts and elevated roadways. It carries traffic loads while accommodating the movement of the structure.
The system consists of two steel edge beams securely anchored into the concrete deck, with a continuous neoprene rubber seal locked into both edge beams. The seal keeps the joint watertight and gives a smooth transition for vehicles. It can be replaced without removing the edge beams, giving a long service life under heavy traffic and varying temperatures.
Advantages
- Watertight: continuous neoprene seal locked into both edge beams
- Smooth ride: edge beams set flush with the road surface
- Heavy duty: steel edge beams anchored into the deck to carry traffic loads
- Replaceable seal: the seal can be replaced without removing the edge beams
- Corrosion protection: edge beams coated with grey epoxy zinc-rich primer, 60 microns
- Long service life: durable under heavy traffic and varying temperatures
Where it is used
- Bridges and flyovers
- Highway bridges
- Viaducts
- Approach slabs
- Elevated roadways
- Bridge joint replacement
Specifications
From the UNIJOINT CL SERIES technical data sheet. Check the latest TDS for your submittal.
| Type | CL 100 |
|---|---|
| Movement capacity | ±40 mm (80 mm total) |
| Seal opening a (min / mid / max) | 10 / 50 / 90 mm; 50 mm at installation unless the engineer directs otherwise |
| Blockout c / d / b | 350 / 350 / 250 mm (width each side / depth) |
| Unit length | 5000 mm |
| Anchor loop spacing | 200 mm |
| Edge beam | DT-F steel profile 40 x 70 with claw for the seal, Q355B steel |
| Rubber seal | W-seal, neoprene (CR), locked into both edge-beam claws, one continuous length |
| Anchor loop | Looped deformed steel anchor bar welded to the edge beam at 200 mm |
| Shuttering plate | Steel plate on the gap face, closes the blockout |
| Corrosion protection | Grey epoxy zinc-rich primer, 60 microns |
| Blockout concrete | C40 – C50 high-strength, steel-fibre or epoxy concrete as specified |
| Drawing | UR-JT-04 |
Questions about UNIJOINT CL SERIES
What is UNIJOINT CL SERIES?
A single-gap section steel expansion joint, also known as a strip seal joint, for bridges, viaducts and elevated roads. Two steel edge beams are anchored into the deck and a continuous neoprene W-seal is locked into both beams to keep the joint watertight.
How much movement can CL 100 take?
UNIJOINT CL 100 takes ±40 mm, 80 mm total. The seal opening at the road surface is 10 mm fully closed, 90 mm fully open and 50 mm at installation unless the engineer directs otherwise. Joint selection and blockout design are by the engineer.
What blockout does it need?
350 mm wide on each side and 250 mm deep, per the TDS. Weld Ø16 mm or larger anchorage bars to the reserved reinforcement every 2 to 3 bars, then pour epoxy-resin, steel-fibre or C40 to C50 high-strength concrete as specified.
Can the seal be replaced?
Yes. The W-seal can be replaced without removing the edge beams. Replace it immediately if leakage or tearing is found during routine cleaning.
How is UNIJOINT CL 100 installed?
Prepare the blockout, preset the seal opening to 50 mm with temporary frames, lower the joint in level with the finished surface and weld the anchor loops to the reserved reinforcement (Ø16 mm or larger) every 2 – 3 bars. Close the gap with formwork, pour C40 – C50 concrete, and loosen the temporary frames after initial set, no later than 2 hours. Fit the seal in one continuous length and pave 0 – 5 mm above the edge beams, never below.
What maintenance does it need?
Clear debris from the seal groove every 3 – 6 months. Every 12 months, check the seal for leaks or tears (replace at once if damaged), the edge beam to pavement interface for cracks, and the riding surface for smoothness and noise. Re-coat exposed steel with zinc-rich epoxy every 3 – 5 years.
Drawings & CAD details
3 PDF drawing sheets and 3 editable CAD details (DXF / DWG). Free to download, no sign-up.
Bridge Highway Joint System – 3D
Bridge Highway Joint System
For illustration only – not for construction. Generic product details, not an engineering design. Sizes, reinforcement and installation to be designed and approved by the project engineer. Refer to the TDS.